Checking the Rated Specifications
1080.9506.02
5.7
E-4
5.2.8.2 Battery
Identification
Preparation:
½
Remove battery.
½
Connect the power cord and wait for completion of the switch-on process.
½
Plug in the battery.
Test:
The charging symbol appears on the display.
5.2.8.3
Automatic Switch-Off of Charging
Preparation:
½
Connect NRT to AC supply, insert battery into option NRT-B3.
½
Switch on the NRT with the ON/STBY key and wait for completion of switch-on
process.
½
Select in the UTIL - BATTERY CHARGE menu the parameter ON.
Test:
The battery charging symbol should disappear after max. 2.5 hours (end of
charging). The charging time can be considerably reduced with the battery only
partly discharged.
½
If charging is completed later, repeat the check with another battery.
深圳德标仪器
135-1095-0799
Summary of Contents for NRT 1080.9506.02/.62
Page 2: ...深圳德标仪器 135 1095 0799 ...
Page 4: ...深圳德标仪器 135 1095 0799 ...
Page 6: ...深圳德标仪器 135 1095 0799 ...
Page 16: ...深圳德标仪器 135 1095 0799 ...
Page 18: ...深圳德标仪器 135 1095 0799 ...
Page 178: ...深圳德标仪器 135 1095 0799 ...
Page 190: ...深圳德标仪器 135 1095 0799 ...