![Rohde & Schwarz NRT 1080.9506.02/.62 Operating Manual Download Page 154](http://html.mh-extra.com/html/rohde-and-schwarz/nrt-1080-9506-02-62/nrt-1080-9506-02-62_operating-manual_1477860154.webp)
Checking the Rated Specifications
NRT
1080.9506.02
5.2
E-4
5.1.1
Test Setup for Checking the Option NRT-B1
Test setup:
2
NRT + NRT-B1
Leistungsmesser
(NRVD)
NRV-Z54
NAP-Z..
Meßsender
(SMGL)
Oberwellen-
filter
Leistungs-
verstärker
1
5.2 Test
Procedure
After power up the NRT checks all sensor interfaces for sensors being connected and all options. If a
fault is detected, an error message or warning is displayed. Faults are located according to Section 4.4,
Trouble Shooting. Further tests can be triggered in the UTILity - TEST menu (Section 2.5.11, Test (Built-
in Tests)).
5.2.1 Switch-On
Sequence
Preparation:
½
Connect the NRT without sensors to the AC supply.
Test:
The NRT should be automatically switched on without actuation of the ON/STBY
key.
½
Switch off and restart the NRT using the ON/STBY key.
5.2.2
Display and Keypad
5.2.2.1 Display
Test
Preparation:
½
Select the function parameter LCD in the UTIL - TEST menu.
Test:
All segments in the display should be shown until the SEL(LOCAL) key is pressed
again.
深圳德标仪器
135-1095-0799
Summary of Contents for NRT 1080.9506.02/.62
Page 2: ...深圳德标仪器 135 1095 0799 ...
Page 4: ...深圳德标仪器 135 1095 0799 ...
Page 6: ...深圳德标仪器 135 1095 0799 ...
Page 16: ...深圳德标仪器 135 1095 0799 ...
Page 18: ...深圳德标仪器 135 1095 0799 ...
Page 178: ...深圳德标仪器 135 1095 0799 ...
Page 190: ...深圳德标仪器 135 1095 0799 ...