Setting up a measurement
R&S
®
NRPM
49
Mannual 1425.8663.02 ─ 08
Setup
Figure 6-6: Setup with an R&S
NRP
‑
Z5 sensor hub
1 = Controller PC
2 = USB cable
3 = R&S
NRP
‑
Z5 sensor hub
4 = NRP-ZK6 cables
5 = USB host interface connector
6 = R&S
NRPM3 sensor module
7 = Antenna connector
8 = Antenna module(s)
9 = AC power supply
10 = External power supply unit
To connect a setup with several sensor modules using the R&S
NRP
‑
Z5
.
1. Connect the R&S
NRP
‑
Z5 to the computer.
2. Connect the NRP-ZK6 to the power sensor, see
sensor module and the controller PC"
3. Connect the USB connector of the NRP-ZK6 to the R&S
NRP
‑
Z5 sensor hub.
4. If necessary, connect further sensor modules to the sensor hub accordingly.
5. Connect the external power supply unit to the R&S
NRP
‑
Z5 and to the mains.
6. Establish the connection of the antenna modules as described in
ter 6.3.1, "Connecting the RF frontend"
Connecting an R&S
NRPM OTA power measurement