51
Calibration
8.5 Calibration
8.5.1 Calibrating Water, Milk, MP and Detergent
Calibration is defined as the input into the computer of the amount of water, milk , MP and
detergent dispensed during a specific time.
Turn the program switch to 5 = calibration.
Select submenu „Water Boiler“, „Water HE“, „Milk“, „MP“
or „Detergent“.
Hereinafter we will exemplarily describe how to calibrate boi-
ler water:
Press Arrow Right to go to the next screen.
Hold an empty measuring vessel under the discharge.
Press Start/Stop.
Measure or weigh the collected quantity.
Press ENTER and enter the measured or weighed quantity.
Press ENTER once again.
The entered figure disappears as soon as you press Start/Stop.
The calibration process is said to be completed as soon as the
set quantity is attained.
Press Arrow Right. The display shows when the correspon-
ding component has been calibrated last.
Press Arrow Right. The display shows the time needed to dis-
pense the set quantity.
The warning message „Dosing time too long“ means that the
dispensed resp. measured or entered quantity was too small.
The set quantity was not attained.
Press Arrow Up resp. Arrow Down to move to the following
menus:
calibration
water boiler
➔
^
calibration
water boiler
➔
^
water targ.: 500 ml
measured:
... ml
water targ.: 500 ml
measured:
390 ml
water targ.: 500ml
measured:
...ml
➔
water last calib.
on 17.07.03
water targ.: 500 ml
duration:
4.00 s
dosing time too long
calibration
water HE
➔
^
Summary of Contents for TAK5-SA2-KFA-27-F1
Page 2: ......
Page 179: ...L Annex Example Milk ratio plan group A...
Page 180: ...M Annex Example Milk ratio plan group B...
Page 181: ...N Annex Form Feeding plan...
Page 182: ...O Annex Form Concentration plan...