36
Input Routine
6.2.1 Exercises Concerning the Switch Menus
Turn the program switch to 5 = calibration. The first submenu
„Water boiler“ is displayed.
Press Arrow Up or Arrow Down to move to further submenus
(Water HE, Milk, MP, Additives, Detergent).
Press Arrow Right to move to the following screen.
6.2.2 Exercises Concerning the Keyboard Menus
Turn the program switch to 10 = keyboard.
Enter 10 and press ENTER to confirm the inputs.
Go to the first screen and press ENTER. The cursor starts
flashing.
Enter the duration of the feeding period. Press ENTER to
confirm the input.
➔
^
calibration
water boiler
➔
^
calibration
water boiler
water targ.:500ml
measured:
...ml
➔
10# feeding plan
group A
^
➔
10# A per.1
3 days
fr. 6.0 to 6.0 L
➔
10# A per.1
6 days
fr. 6.0 to 6.0 L
➔
Summary of Contents for TAK5-SA2-KFA-27-F1
Page 2: ......
Page 179: ...L Annex Example Milk ratio plan group A...
Page 180: ...M Annex Example Milk ratio plan group B...
Page 181: ...N Annex Form Feeding plan...
Page 182: ...O Annex Form Concentration plan...