T
echnical
B
ulletin
PAGE: 1/2
Model:
Taurus-C1a/C1b (D074/D075)
Date:
5-Dec-13
No.:
RD074110
Subject:
Correct procedure to reset PM parts counter for
customer sites using 2 or more fusing units per
machine
Prepared by:
Shinnosuke Sasaki
From:
1st PP Tech Service Sec., PP Tech Service Dept.,
Troubleshooting
Mechanical
Paper path
Part information
Electrical
Transmit/receive
Action required
Service manual revision
Retrofit information
Classification:
Product Safety
Other ( )
Tier 2
General
This bulletin announces the correct procedure for resetting the PM parts counter of the
fusing unit for customer sites where 2 or more fusing units are used per machine.
Procedure
When 2 or more fusing units are used per machine:
Here we suppose a case where two fusing units A and B are used and a PM part needs to
be replaced for fusing unit A that is currently installed in the machine.
1. Turn the main power switch Off.
2. Take out fusing unit A and install fusing unit B.
3. Turn the main power switch On.
4. Replace the PM part for fusing unit A.
5. Turn the main power switch Off.
6. Take out fusing unit B and install fusing unit A.
7. Turn the main power switch On.
8. Reset the PM counter of the replaced part.
9. Set the Manual New Unit Set (SP 1190-01, 02, 03, 04) On for the replaced part.
10. Turn the main power switch Off and On to complete the procedure.
When only 1 fusing unit is used per machine:
1. Turn the main power switch Off.
2. Take out the fusing unit.
3. Replace the PM part.
4. Put back the fusing unit.
5. Reset the PM counter of the replaced part.
6. Set the Manual New Unit Set (SP 1190-01, 02, 03, 04) On for the replaced part.
7. Turn the main power switch Off and On to complete the procedure.