T
echnical
B
ulletin
PAGE: 9/14
Model:
Taurus-C1 (D074/D075)
Date:
22-Jun-2011
No.:
RD074015a
Correction 5:
Revised “After Replacement” Procedure for ITB Lubrication Blade
Please ignore the “After Replacement” Procedure for ITB Lubrication Blade as described
in the FSM and use the following procedure instead:
Replacement and Adjustments > Image Transfer Belt (ITB) Unit > Lubrication Blade
1. Install the cleaning unit. (Keep the levers in the “unlocked” position. Do not attach the
cover yet.)
2. The machine power must be OFF.
3. Remove the PTR unit.
4. Turn the main power switch ON and close both front doors.
5. Enter the SP mode.
6. Reset the counter for the replaced unit or parts.
7. Open the right front door, and access SP2310-1 (Force Lubricant – Belt Cleaning).
8. Immediately after the above step, close the right front door to run the above SP.
9. Wait for about 5 minutes. When you see “Completed” displayed on the operation panel,
you are ready to continue.
10. Reinstall the PTR unit.
11. Rotate both levers of the ITB cleaning unit counter-clockwise and install the front cover.
12. Execute these SP codes.
SP
What It Does
3020-001
Initializes process control
3012-001
Confirm successful initialization of process control
13. Exit the SP mode.