1.Installation
13
[G]: Power Connector
[H]: Main Power Switch
[I]: Diagnostic LEDs (For service use only)
[J]: Service Switches (For service use only)
Connecting E-25C to the Copier
After you unpack the E-25C, connect the E-25C to the copier before you connect it to the network. This
is to confirm that there are no problems with the hardware and controller itself.
Preparing the Copier
Before doing the following steps, turn OFF the controller main power switch and copier main
power switch, and disconnect the power cords.
1.
Remove the rear cover [A].
2.
Remove the controller box cover [A].
Red Circle: Remove / Blue Circle: Loosen
Summary of Contents for D3GF
Page 2: ......
Page 6: ......
Page 13: ...1 Installation 7 Installation Flow Chart Recommended installation steps are as follows ...
Page 46: ...1 Installation 40 If activation does not require a restart Server Option Client Option ...
Page 71: ...3 Replacement 65 Cover Removal Side Cover for the E 25C 1 Remove the side cover A ...
Page 93: ...4 System Maintenance 87 Command WorkStation For details refer to the Command WorkStation help ...
Page 187: ...7 Specifications 181 H 4 9 x 14 3 x 11 6 Weight 5 5 kg 12 2 lb ...