1.Installation
5
Minimum Space Requirements
Place the machine near the power source, providing clearance as shown.
1.
Copier
2.
Large Capacity Tray
You may place the machine [A] on the right side of the large capacity tray or copier as shown (top view)
in the illustration.
Power Requirements
Insert firmly the plug in the outlet.
Avoid using an outlet extension plug or cord.
Ground the machine. Avoid using a 3-pronged adapter in a 2-hole ungrounded outlet.
Use the supplied AC power cord with this product.
1.
Input voltage level: 100 - 240V, 50 - 60Hz; 3A
2.
For Norway, this product is also designed for an IT power distribution system with phase-to-phase
voltage 230V.
3.
Do not put anything on the AC power cord.
Network Requirements
Make sure that the network is available at the time set for installation.
Summary of Contents for D3GF
Page 2: ......
Page 6: ......
Page 13: ...1 Installation 7 Installation Flow Chart Recommended installation steps are as follows ...
Page 46: ...1 Installation 40 If activation does not require a restart Server Option Client Option ...
Page 71: ...3 Replacement 65 Cover Removal Side Cover for the E 25C 1 Remove the side cover A ...
Page 93: ...4 System Maintenance 87 Command WorkStation For details refer to the Command WorkStation help ...
Page 187: ...7 Specifications 181 H 4 9 x 14 3 x 11 6 Weight 5 5 kg 12 2 lb ...