Cells ...................................................................... 59
10.2.9 Regeneration of the Water Hardness Meter ......... 60
10.3 Commissioning the system after maintenance......... 61
10.3.1 Commissioning process......................................... 61
11 Preventative maintenance.................................................. 63
11.1 Stopping Production................................................. 63
11.2 Maintenance on the water softener.......................... 63
11.2.1 Maintenance on the Simplex water softener.......... 64
11.2.2 Maintenance on the Duplex water softener........... 68
11.2.3 Replacing the Water Filter..................................... 71
11.3 Maintenance on the Brine Storage Tank.................. 71
11.3.1 Checking the Float on the Level Switch................. 72
11.3.2 Cleaning the Suction Unit in the Brine Storage
Tank....................................................................... 73
tank........................................................................ 74
11.4.2 Draining the production tank.................................. 74
11.4.3 Replacing the Booster Pump O-rings ................... 76
11.4.4 O-rings on the Three-part Coupling at the Meas‐
uring Point.............................................................. 76
11.4.5 Heat Exchanger O-rings on the Production Tank
-III < 600 g/h).............................. 77
11.4.6 Replacing the O-rings on the Transport Stop‐
cock....................................................................... 77
11.4.7 Replacing the Transport Valve.............................. 78
11.4.8 Replacing the Seals on the Water Jet Pump......... 79
11.4.9 Cleaning the Water Jet Pump Nozzle.................... 80
11.4.10 Replacing the O-rings on the Stopcock Under
the Production Tank ............................................ 81
11.4.11 Replacing the O-rings on the underside of the
production tank.................................................... 82
11.4.12 Checking the Temperature Sensor in the Pro‐
duction Tank........................................................ 83
11.4.13 Replacing the Seals on the Upper Side of the
Production Tank................................................... 84
11.4.14 Checking the Level Switch in the Production
Tank .................................................................... 85
11.4.15 Replacing the Chlorine Gas Valve....................... 85
11.4.16 Fitting All Components......................................... 86
11.5 Maintenance on the Lye Storage Tank .................... 86
11.5.1 Preparation for Maintenance on the Lye Storage
Tank....................................................................... 87
11.5.2 Draining the Lye Storage Tank.............................. 88
11.5.3 Replacing the O-rings on the Stopcocks on the
Bottom of the Lye Storage Tank............................ 89
11.5.4 Replacing the O-rings on the Couplings on the
Bottom of the Lye Storage Tank............................ 89
11.5.5 Replacing the O-rings on the Heat Exchanger
-III < 600 g/h).............................. 90
11.5.6 Replacing the Seals on the Upper Side of the Lye
Storage Tank......................................................... 91
Table of contents
4
Summary of Contents for Chlorinsitu-III
Page 18: ...A1706 15 4 13 3 3 16 12 17 Fig 8 Components of the system side B Components of the system 18 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 119: ...119 ...