30. Connect the cables on terminal strip X1-21
n
The brown cable in the first row of the terminal strip
n
The blue cable in the second row of the terminal strip.
Do not remove the jumpers in the terminal strips.
31. Connect the power cable of the system, as per the table
below, to the terminal strip in the control cabinet, taking into
account the rating values.
Note the following when installing them:
n
Make sure that the system is switched off when making
or adjusting the electrical connections.
n
Ensure that the electrical connections comply with the
wiring diagram supplied
n
Cleanly close up the cable ducts of the system on com‐
pletion of installation.
n
3F, + N and + PE are connected at the bottom right of the
control cabinet.
Capacity
Main fuse
Voltage
Output
100 (g/h)
16 A
3 x 400 V AC
1.65 kW
200 (g/h)
16 A
3 x 400 V AC
2.25 kW
300 (g/h)
16 A
3 x 400 V AC
2.85 kW
400 (g/h)
16 A
3 x 400 V AC
3.45 kW
500 (g/h)
16 A
3 x 400 V AC
4.05 kW
600 (g/h)
20 A
3 x 400 V AC
4.65 kW
750 (g/h)
25 A
3 x 400 V AC
5.55 kW
1000 (g/h)
25 A
3 x 400 V AC
7.05 kW
1250 (g/h)
35 A
3 x 400 V AC
8.55 kW
1500 (g/h)
35 A
3 x 400 V AC
10.05 kW
1750 (g/h)
35 A
3 x 400 V AC
11.55 kW
2000 (g/h)
50 A
3 x 400 V AC
13.05 kW
2500 (g/h)
63 A
3 x 400 V AC
16.05 kW
3000 (g/h)
63 A
3 x 400 V AC
19.05 kW
3500 (g/h)
80 A
3 x 400 V AC
22.05 kW
Connecting the brine tank level switch
Electrically installing the system
Installation and assembly
29
Summary of Contents for Chlorinsitu-III
Page 18: ...A1706 15 4 13 3 3 16 12 17 Fig 8 Components of the system side B Components of the system 18 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 119: ...119 ...