18
Check whether there are leaks and whether a vacuum state has been achieved.
19
Start an anode refresh.
20
Measure the voltage at the membrane cell and monitor whether the voltage is not above
5 V DC per chamber.
21
Measure and check during production that the amperage is identical to the current
measured and shown on the control panel.
Maintenance checks and preparation for maintenance
62
Summary of Contents for Chlorinsitu-III
Page 18: ...A1706 15 4 13 3 3 16 12 17 Fig 8 Components of the system side B Components of the system 18 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 119: ...119 ...