24. Electrically connect the pressure sensor to the terminal box
of the system.
Cable
Terminal
Black
X3 - 65
White
X3 - 66
Shielding
Earth
Description
Level switch
Terminal strip
Liquid level too high
5LAHH45
X1-11
Electrically connect the level switch to the control cabinet.
25. Connect a PVCU cooling water drainage line between the
"Cooling water outlet" connector and the sewerage system or
a buffer.
26. Connect the 1.8 mm PE hose (Ø 16 mm) between the "Brine
storage tank filling" connector on the system and the con‐
nector (Ø 16 mm) on the brine tank.
Connecting 1.8-mm PE hoses
A1717
1.
2.
Fig. 13: PE coupling (1 and 2) for PE
hose, shown for the 100 ... 500 g/h
Installation and assembly
27
Summary of Contents for Chlorinsitu-III
Page 18: ...A1706 15 4 13 3 3 16 12 17 Fig 8 Components of the system side B Components of the system 18 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 119: ...119 ...