Commissioning
8.1 Check-list: Preparation for commissioning
n
User qualification, preparation for commissioning: trained quali‐
Chapter 2.2 ‘User qualification’ on page 10
Customer
Project number
Capacity
g/h
Description
Customer-specific components
Tested by
Start time
End time
Pre-commissioning
Commissioning
Tab. 2: Basic production settings for testing and commissioning.
Capacity
Cell type
Current Max. voltage
Brine volume
Anode refresh
Lye
33 %
Main fuse
g/h
(A)
(V)
ml *
(l)
(A)
100
HMC 10-1
100
6
200
3
16
200
HMC 10-2
100
11
400
3
16
300
HMC 10-3
100
17
600
3
16
400
HMC 10-4
100
22
800
3
16
500
HMC 10-4
125
22
800
3
16
600
HMC 25-2
300
11
1100
8
20
750
HMC 25-3
250
17
1600
8
25
1000
HMC 25-4
250
22
2200
9
25
1250
HMC 25-4
313
22
2200
9
35
1500
HMC 25-5
300
27
2700
9
35
1750
HMC 25-5
350
27
2700
9
35
2000
2HMC 25-4
250
44
2200
13
50
2500
2HMC 25-4
300
44
2200
13
63
3000
2HMC 25-5
300
55
2700
13
63
3500
2HMC 25-5
350
55
2700
13
80
* The parameters are based on an ambient temperature of 20 °C and a salt concentration of 280 g/l. The
refresh time is calculated by the PLC. Changing the parameters affects the refresh time.
Commissioning process for Chlorin‐
situ-III
Commissioning
36
Summary of Contents for Chlorinsitu-III
Page 18: ...A1706 15 4 13 3 3 16 12 17 Fig 8 Components of the system side B Components of the system 18 ...
Page 117: ...117 ...
Page 118: ...118 ...
Page 119: ...119 ...