Dokument
D
GB-0600 Dokum D Anbaugeräte
PÖTTINGER Landtechnik GmbH
Industriegelände 1
A-4710 Grieskirchen
Tel. 07248 / 600 -0
Telefax 07248 / 600-2511
T
Machine checked according to delivery note. All attached parts removed. All safety equipment, drive shaft and operating
devices at hand.
T
Operation and maintenance of machine and/or implement according to operating instructions explained to the customer.
T
Tyres checked re. correct pressure.
T
Wheel nuts checked re. tightness.
T
Drive shaft cut to correct lenght.
T
*VYYLJ[WV^LY[HRLVɈZWLLKPUKPJH[LK
T
Fitting to tractor carried out: to three-point linkage
T
Trial run carried out and no defects found.
T
Functions explained during trial run.
T
Pivoting in transporting and operating position explained.
T
Information given re. optional extras.
T
Absolute need to read the operating manual indicated.
Please check.
X
According to the product liability please check the above mentioned items.
INSTRUCTIONS FOR
PRODUCT DELIVERY
GB
In order to prove that the machine and the operating manual have been properly delivered, a confirmation is necessary.
For this purpose please do the following:
- sign
the
document A
and send it to the company Pöttinger or via the internet to www.poettinger.at
-
document B
stays with the specialist factory delivering the machine.
-
document C
stays with the customer.
Summary of Contents for EUROTOP 1251 A
Page 33: ...29...
Page 64: ...3 Bedienung Operation Utilisation Bediening Manejo...
Page 97: ...4 Wartung Maintenance Entretien Onderhoud Entretenimiento...
Page 103: ......
Page 120: ...5 Schmierplan Lubrication Chart Plan de graissage Smeerschema Esquema de engrase...
Page 123: ...EUROTOP 1251 4 5...
Page 124: ...6 4 5 EUROTOP 1251 5 5 65423 3 2 3 4 2 3 4 5 5 2 6...
Page 125: ...0 EUROTOP 1251 6 5 8 9 7 65419F 7 8 0 7 9...
Page 126: ...5 6 3 EUROTOP 1251 7 5 65424 2 4 4 3 5 6 2 2...
Page 127: ...20 9 8 EUROTOP 1251 8 5 8 9 7 20 7 244 14...
Page 128: ...244 14 244 14 25 24 23 EUROTOP 1251 9 5 2 22 25 23 24 2 22...