Draft - 1 Aug 08
Testing Transceiver Functionality
Basic Operation
4-11
Testing Transceiver Functionality
There are two tests of IntelliVue Transceiver functionality:
•
Self Test
- performed automatically each time the transceiver is turned on.
•
Status Check
- initiated manually by the clinician.
Self Test
Warning
Warning
Do not use the transceiver for patient monitoring if it fails the Power On
Self Test.
Caution
Do not insert a leadset during a self-test. The leadset can be inserted after the
self-test.
A self test of the transceiver functions is automatically performed each time that
the transceiver is turned on (that is, when batteries are inserted). This test should
be performed before ECG leads and/or an SpO
2
sensor is attached.
In Case of
Failure
If any portion of the self test fails, the transceiver will attempt to report the
failure to the monitoring system. In case of failure, use another transceiver, and
contact your service provider.
Self Test
Status
Auditory
Signal
Visual Indicators
Passed
beep
All indicators illuminate for 3 seconds.
Failed
beep beep
One or more indicators do not light up.
Summary of Contents for IntelliVue TRx
Page 6: ...Draft 1 Aug 08 About this Book vi ...
Page 40: ...Draft 1 Aug 08 Accessories 2 18 Product Safety ...
Page 54: ...Draft 1 Aug 08 Audible Tones 3 14 Transceiver Controls ...
Page 74: ...Draft 1 Aug 08 Battery Information 4 20 Basic Operation ...
Page 94: ...Draft 1 Aug 08 Technical Alarms INOPs 5 20 Alarms ...
Page 152: ...Draft 1 Aug 08 How the QT Analysis Algorithm Works 7 24 ST AR Arrhythmia Monitoring ...
Page 176: ...Draft 1 Aug 08 Optimizing SpO2 Measurement Performance 8 24 SpO2 Monitoring ...
Page 236: ...Draft 1 Aug 08 Troubleshooting 11 16 Maintenance Cleaning Troubleshooting ...
Page 268: ...Draft 1 Aug 08 SpO2 Accessories A 10 Accessories ...
Page 270: ...Draft 1 Aug 08 B 2 Sales and Support Offices ...
Page 274: ...Draft 1 Aug 08 Index 4 ...