12. Appendix
12-14
EQ100 Operation
12.2.3.
How do I
Operation
Refer to
Start
communication
test?
Use the Web UI to start communication test
or use EQ-Manager to switch to
communication test (select [Logger] menu -
[Start Test])
This manual: "8.3.
EQ-Viewer User's Manual:
"4.7 EQ100 Operations"
Start collecting and
logging?
Either press the RUN/STOP button on the
EQ100 front end, use the Web UI to start
collecting, or use EQ-Manager to start
collecting (select [Logger] menu - [Start
Logging])
This manual: "8.4. Start "
View the collecting
status?
Status of Each
Measurement
Device
Use EQ-Manager to
connect online and
select [Operation
Monitor]
This manual: "8.2.
Status of Each
Measurement
Channel
On the Web UI screen,
select [Current Value
Monitor]
This manual: "9.5. Simple
Inhibit collecting
start by the
RUN/STOP button
on the EQ100 front
end?
Configure the DIP switch SW9 as ON on the
EQ100 front end
This manual: "2.1.3.
Start up in the safe
mode?
Configure the DIP switch SW10 as ON on
the EQ100 front end, and reset or turn on the
power
This manual: "11.1.
Clear the previous
value in EQ100?
On the Web UI screen, select [Update] -
[Clear Previous Electric Energy]
This manual: "9.13.
Update an EQ100
project file?
On the Web UI screen, select [Update] -
[Read EQ project]
This manual: "9.13.
Update the EQ100
firmware?
On the Web UI screen, select [Update] -
[Firmware Update], or under the safe mode
select [Firmware Update] on the Web UI
screen
This manual: "9.13.