2. Specifications
2-1
Specifications
2.
2.1. Part Name
EQ100 Front End
2.1.1.
No. Indication Name
Function
1
L,N
Supply Terminal (M3.5
screw)
To connect to 100 to 240 VAC power
source.
2
Grounding Terminal (M3.5
screw)
To connect to ground wire.
3
RS485_1
RS-485 Communications
Port #1 Terminal
(M3.5 screw)
To connect to RS-485-connected
measurement device.
4 RUN/STOP RUN/STOP Button
To switch between the setup and collecting
statuses.
5
RESET
Reset Button
To restart after changing the setup.
6
RS485
□
1
RS485 Communications Port
#1 Operation Indicator
To indicate an operation status of the
RS-485 communications port #1.
7
OP1
OPTION1 Operation
Indicator
(for future expansion)
8
OP2
OPTION2 Operation
Indicator
(for future expansion)
9
DIP SW
Setup DIP Switch
To configure EQ100 operation.
10
ALM
Monitoring Alarm Indicator
To indicate a monitoring alarm status.
11
RUN
Collecting Status Indicator
To indicate an operation status of the
EQ100 such as setup and collecting
statuses.
12
ERR
Device Alarm Indicator
To indicate a device alarm status.
13
PWR
Operation Status Indicator
To indicate a power supply status and an
operation mode.
14 OPTION1 OPTION1 Connection Port (for future expansion)
15 OPTION2 OPTION2 Connection Port (for future expansion)
16
LAN
LAN Connection Port
(RJ-45)
To connect a LAN cable for the upper level
system, a Web UI computer, or a
LAN-connected measurement device.(*1)