4. Basic Operation Steps
4-1
Basic Operation Steps
4.
This chapter describes basic operation steps of EQ100. For detail setup and operations, see
reference for each step.
4.1. [STEP 1] Standalone Configuration
Described below are basic operation steps for a standalone configuration operated by the Web
UI function only.
[Step 1] Measurement Device Setting (including Communications
Setting)/Measurement Setting
Operate the measurement device itself or use the setup software for the measurement
device to configure the device main setting (including communications setting) and
measurement setting.
Precautions for Correct Use
- EQ-Manager cannot configure measurement device setting (including communications
setting)/measurement setting. Operate the measurement device itself or use the setup tool
for the measurement device to configure the required settings.
Refer to
“6. Measurement Device Setup and Connection”, “Measurement Device
Manuals”
[Step 2] Connecting Memory Backup Battery
Connect a memory backup lithium battery to EQ100, and remove the caution label attached
on the top of theEQ100.
Precautions for Correct Use
- If EQ100 power is turned off without connecting a memory backup battery, proper data
collecting may not be available due to loss of collected data of the latest 1 hour and/or
reset of the built-in clock. Always connect a battery.
Refer to
Setting
Simple Graph View
Web UI Function
Collected
Data
Collecting
EQ Project
Checking latest
measured data/
viewing graph
Transfer from PC
or
Transfer from SD card
Measurement Devices