7 - 26
LLE11ARDA001A/E
7.11.4 Adjusting the Drill Zero Point (Z)
1. Read the Drill Adjustment Pattern (Pos.).
(See 7.2.5.)
2. Put the lens into the processing chamber and
grind it.
3. Measure C and D of the ground lens with a
vernier calipers.
4. Verify that the difference between C and D is
within ±0.1mm.
5. Follow the procedures below when the
difference between C and D is not within
±0.1mm.
1) Establish the Parameter Setting mode.
(See 7.1.2.)
2) Press Adjustment.
3) Press Groove & Drilling.
4) Change the following parameter settings.
a. Drill Zero Point (Z)
* D>C, The difference is 1.0mm.: Add +0.5
to the parameter.
%
&
4QWIJ5K\G
(KPKUJ5K\G
2QNKUJ5K\G
2QNKUJ&KHH
#:+5
5CHGV[$GXGN
)TQQXG&TKNN
Adjustment
)TQQXG2QUKVKQP
)TQQXG&GRVJ
%WVVGT<GTQ2QKPV
*QNG&KCOGVGT
*QNG5NQV4GHGTGPEG
&TKNN<GTQ2QKPV<
&TKNN*QNG8GTVKECN2QUKVKQP;
(TQPV5WTHCEG1HHUGV
*QNFG&GRVJ:
)TQQXG2QUKVKQP
)TQQXG&GRVJ
%WVVGT<GTQ2QKPV
*QNG&KCOGVGT
*QNG5NQV4GHGTGPEG
&TKNN<GTQ2QKPV<
&TKNN*QNG8GTVKECN2QUKVKQP;
(TQPV5WTHCEG1HHUGV
*QNFG&GRVJ:
BACK
Summary of Contents for ME-1000
Page 8: ...1 2 LLE11ARDA001A E...
Page 12: ...3 2 LLE11ARDA001A E...
Page 120: ...7 34 LLE11ARDA001A E...
Page 121: ...8 1 LLE11ARDA001A E 8 SUPPLEMENT 8 1 Wiring Diagram...
Page 122: ...8 2 LLE11ARDA001A E 8 2 Connector Cable...
Page 123: ...8 3 LLE11ARDA001A E...
Page 125: ...8 5 LLE11ARDA001A E 8 4 Labels Top view Processing chamber...
Page 126: ...8 6 LLE11ARDA001A E Rear view or...