3.4
Main Operation Example
EC1000SA
3-18
⇒
Main operations screen is displayed.
Figure 3-12. Example of Main Operations Screen (in AC-INT Mode)
The main operations screen that appears immediately after the power-on shows the same
settings that were displayed the last time the power was turned off. When a newly purchased
product is turned on for the first time, the initial settings (factory settings) are displayed.
⇒
See “3.2 Display and Initial Settings at Power-on”
, for description of the initial
settings.
⇒
See
“4.8
Using Memory Functions”
, for description of how to read settings saved to
memory.
⇒
See “7. TROUBLESHOOTING”
, for a list of warnings and error messages, along with
recommended responses
.
b) Power-off
After confirming that the output is off, set the POWER switch to “
”.
OUTPUT
OUTPUT
Output on
Output off
⇒
The power source is cut and turned off.
•
Before turning off the power, make sure the OUTPUT setting is off.
•
Before turning off the power of EC1000SA, always finish remote control. If turn off the power
during remote control, it may be caused unconformity to internal memory state.
Output mode
3.4.2
Output voltage range
3.4.3
Output voltage
3.4.5
Output frequency
3.4.6
Waveform
3.4.4
Limiter function
3.4.7
Select measurement display
3.4.9
!
!
!
!
CAUTION
!
!
!
!
CAUTION
Summary of Contents for EC1000SA
Page 1: ...NF Corporation PROGRAMMABLE AC DC POWER SOURCE EC1000SA Instruction Manual nbn Austria GmbH...
Page 2: ...DA00036667 003 PROGRAMMABLE AC DC POWER SOURCE EC1000SA Instruction Manual...
Page 236: ...6 9 Notes on Remote Control EC1000SA 6 58...
Page 260: ...8 5 Backup Battery EC1000SA 8 8...
Page 280: ...9 17 External Dimensions and Weight EC1000SA 9 20...