4.4
Using the Sequence Function
EC1000SA
4-41
The operation steps are described below.
Operation steps using control panel
1.
Open the
PROGRAM screen.
The steps for opening the PROGRAM screen are described in
“4.4.2 Sequence
settings”
.
Setting step 1
2.
Press the
key to move the cursor to “DC VOLT”.
ENTER
CANCEL
3.
Press the
ENTER
key to display the modification box.
ENTER
CANCEL
4.
Press the
and
keys to move the cursor to the 10’s place, then turn the MODIFY dial to set
“2”. Next, move the cursor to the 1’s place and turn the MODIFY dial to set “5”.
⇒
This sets “25.0 V”.
Increase
Decrease
5.
Press the
CANCEL
or
ENTER
key to close the modification box.
Summary of Contents for EC1000SA
Page 1: ...NF Corporation PROGRAMMABLE AC DC POWER SOURCE EC1000SA Instruction Manual nbn Austria GmbH...
Page 2: ...DA00036667 003 PROGRAMMABLE AC DC POWER SOURCE EC1000SA Instruction Manual...
Page 236: ...6 9 Notes on Remote Control EC1000SA 6 58...
Page 260: ...8 5 Backup Battery EC1000SA 8 8...
Page 280: ...9 17 External Dimensions and Weight EC1000SA 9 20...