3 - 1 3 - 1
MELSEC
3 SPECIFICATIONS
3 SPECIFICATIONS
This chapter explains the specifications of CC-Link Ver.2 board.
3.1 General Specifications
The following table shows the general specifications of CC-Link Ver.2 board.
Item Specification
Operating ambient temperature
0 to 55
Storage ambient temperature
-25 to 75
Operating ambient humidity
5 to 95 % RH, non-condensing
Storage ambient humidity
Vibration resistance
Compliant with
JIS B 3502 and
IEC 61131-2
Under Intermittent vibration
Frequency
Constant
acceleration
Half amplitude
Sweep count
5 to 8.4 Hz
—
3.5 mm
10 times each in
X, Y, Z
directions
8.4 to 150 Hz
9.8 m/s
2
—
Under Continuous vibration
Frequency
Constant
acceleration
Half amplitude
Sweep count
5 to 8.4 Hz
—
1.75 mm
—
8.4 to 150 Hz
4.9 m/s
2
—
Shock resistance
Compliant with JIS B 3502 and IEC 61131-2 (147 m/s
2
, 3 times each in X, Y, Z
directions)
Operating atmosphere
No corrosive gases
Operating altitude 1
0 to 2000 m
Installation location
Inside a control panel
Overvoltage category
2
II or less
Pollution degree
3
2 or less
1: Do not use or store the board under the environment where the atmospheric pressure is higher than the one at the
altitude of 0 m. Doing so may cause a malfunction.
2: This indicates the section of the power supply to which the equipment is assumed to be connected between the public
electrical power distribution network and the machinery within premises. Category II applies to equipment for which
electrical power is supplied from fixed facilities.
The surge voltage withstand level for up to the rated voltage of 300V is 2500V.
3: This index indicates the degree to which conductive material is generated in terms of the environment in which the
equipment is used.
Pollution degree 2 is when only non-conductive pollution occurs. A temporary conductivity caused by condensing must
be expected occasionally.
REMARK
General specifications both CC-Link Ver.2 board and a personal computer must be
satisfied after installation.
3
Summary of Contents for Q80BD-J61BT11N
Page 2: ......
Page 34: ...1 10 1 10 MELSEC 1 OVERVIEW MEMO ...
Page 54: ...3 12 3 12 MELSEC 3 SPECIFICATIONS MEMO ...
Page 124: ...5 16 5 16 MELSEC 5 PROCEDURE BEFORE STARTING THE DATA LINK MEMO ...
Page 160: ...9 2 9 2 MELSEC 9 MELSEC DATA LINK LIBRARY MEMO 9 ...
Page 200: ...12 16 12 16 MELSEC 12 COMMUNICATION BETWEEN THE MASTER STATION AND LOCAL STATIONS MEMO ...
Page 355: ...App 93 App 93 MELSEC APPENDIX MEMO ...
Page 361: ......