14 - 13 14 - 13
MELSEC
14 COMMUNICATION BETWEEN THE MASTER STATION AND
INTELLIGENT DEVICE STATION (AJ65BT-D75P2-S3)
14.5 Executing the Data Link
To start the data link, first power on the intelligent device station, and then the master
station.
14.5.1 Checking the data link status
The following describes how to check the operation status of the master station and
intelligent device stations under normal data link condition.
(1) Checking the master station
Check the operation status of the master station.
(a) Checking by the LED indication on the CC-Link Ver.2 board
Make sure that the LED status is as follows:
SD
RD
RUN ERR.
No error has occurred.
:ON :OFF
Data are being received.
The CC-Link Ver.2 board is operating normally.
Data are being transmitted.
(b) Checking by the CC-Link Ver.2 Utility
Check that the Board detail information on the CC-Link Ver.2 Utility is
displayed as shown below.
In data link: Normal data link is being performed.
ON (green): The CC-Link Ver.2 board is operating normally.
Normal: The CC-Link Ver.2 board is operating normally.
OFF: No error has occurred.
Summary of Contents for Q80BD-J61BT11N
Page 2: ......
Page 34: ...1 10 1 10 MELSEC 1 OVERVIEW MEMO ...
Page 54: ...3 12 3 12 MELSEC 3 SPECIFICATIONS MEMO ...
Page 124: ...5 16 5 16 MELSEC 5 PROCEDURE BEFORE STARTING THE DATA LINK MEMO ...
Page 160: ...9 2 9 2 MELSEC 9 MELSEC DATA LINK LIBRARY MEMO 9 ...
Page 200: ...12 16 12 16 MELSEC 12 COMMUNICATION BETWEEN THE MASTER STATION AND LOCAL STATIONS MEMO ...
Page 355: ...App 93 App 93 MELSEC APPENDIX MEMO ...
Page 361: ......