38
5 INSTALLATION AND WIRING
5.8 Checking System Before Power-on
5.8
Checking System Before Power-on
This section describes the items to be checked before power-on.
1.
Check that the NZ2AW1GNAL is mounted correctly. (
Page 28 Installation Environment and Installation Position)
2.
Check that the station-to-station distance of CC-Link IE TSN is within the specified range. (
3.
Check that the maximum transmission distance (total length) of the AnyWireASLINK system is within the specified
range. (
Page 16 Performance Specifications)
4.
Check that the power supplied to the NZ2AW1GNAL is within the specified range. (
Page 37 Supplying Power to the
5.
Check that the NZ2AW1GNAL, slave module, terminating unit, and 24VDC external power supply are properly
connected and wired.
Summary of Contents for AnyWire ASLINK
Page 1: ...CC Link IE TSN AnyWireASLINK Bridge Module User s Manual NZ2AW1GNAL ...
Page 2: ......
Page 22: ...20 3 PROCEDURES BEFORE OPERATION MEMO ...
Page 96: ...94 8 PROGRAMMING 8 2 Program Example Program ...
Page 100: ...98 8 PROGRAMMING 8 2 Program Example Program ...
Page 101: ...8 PROGRAMMING 8 2 Program Example 99 8 ...
Page 199: ......