30
5 INSTALLATION AND WIRING
5.3 Installation
5.3
Installation
Mounting a module on a DIN rail
Mounting a module on a DIN rail
Removing a module from a DIN rail
5.4
CC-Link IE TSN Connector Wiring
For the connection of CC-Link IE TSN connector, refer to the following.
User's manual for the master station used
1.
Hook the upper fixing tab on the bottom of the
module to the DIN rail.
2.
Push and engage the NZ2AW1GNAL on the DIN
rail.
1.
Insert a flathead screwdriver into the hook and pull
the hook to remove from the DIN rail.
2.
Lift the module on the hook side and remove it
using the fixing tab as the supporting point.
1
2
1
2
Summary of Contents for AnyWire ASLINK
Page 1: ...CC Link IE TSN AnyWireASLINK Bridge Module User s Manual NZ2AW1GNAL ...
Page 2: ......
Page 22: ...20 3 PROCEDURES BEFORE OPERATION MEMO ...
Page 96: ...94 8 PROGRAMMING 8 2 Program Example Program ...
Page 100: ...98 8 PROGRAMMING 8 2 Program Example Program ...
Page 101: ...8 PROGRAMMING 8 2 Program Example 99 8 ...
Page 199: ......