- 1.15 -
2.
Insert the cable of take-up device into the
connector located at the bottom of the capping
station.
PUTTING ON THE MAINTENANCE COVER
1.
Put on the maintenance cover.
2.
Fix the maintenance cover with the screws.
•
Do not open the maintenance cover except
when it is necessary to clean the station interior
(page 4.8 through 4.14).
Opening the maintenance cover during plotting
interrupts image plotting and disables continu-
ous processing.
INSTALLING THE WASTE INK TANKS
Different size of waste ink tank is attached each side of right and left.
Install the large waste ink tank (2000 cc) in right side - the right seen from front.
Left side of Waste Ink tank
1.
Insert the small waste ink tank assy to the
bracket at left side.
2.
Close the bracket and fix with the stop screw.
Screw
Maintenance cover
Operation panel
1000 cc
Summary of Contents for JV4 Series
Page 2: ......
Page 149: ......
Page 150: ...D200571 2 60 16022006...
Page 151: ......
Page 152: ...PrintedinJapan MIMAKI ENGINEERING Co Ltd 2006...