MEDRAD
®
Mark 7 Arterion Injection System
16 - 94
Figure 16 - 5: Insert Power Unit
•
Secure the Power Unit with the four thumb screws (J) attached to the base.
15.
Connect Display Control Unit cord to Display Control Unit connection on the top of the Power
Unit.
16.
Connect the Injector Head connection on the top of the Power Unit.
17.
Align the Display Control Unit cable into the channel on the bottom of the handle assembly
and attach the hook plate (H) to the bottom of the upper mast. Center the black tape on the
cord with the opening of the cover. Leave enough slack in the cable to allow the Display
Control Unit to turn freely.
Figure 16 - 6: Assemble Pedestal
J
J
Summary of Contents for Mark 7 Arterion
Page 1: ...Operation Manual READ BEFORE USING...
Page 2: ......
Page 8: ...MEDRAD Mark 7 Arterion Injection System vi...
Page 10: ...MEDRAD Mark 7 Arterion Injection System 1 2...
Page 16: ...MEDRAD Mark 7 Arterion Injection System 2 8...
Page 23: ...Symbols and Icons 3 15 This Way Up Not made with natural rubber latex...
Page 24: ...MEDRAD Mark 7 Arterion Injection System 3 16...
Page 36: ...MEDRAD Mark 7 Arterion Injection System 5 28...
Page 48: ...MEDRAD Mark 7 Arterion Injection System 8 40...
Page 58: ...MEDRAD Mark 7 Arterion Injection System 9 50...
Page 68: ...MEDRAD Mark 7 Arterion Injection System 10 60 Figure 10 5 ISI Enabled...
Page 80: ...MEDRAD Mark 7 Arterion Injection System 11 72...
Page 90: ...MEDRAD Mark 7 Arterion Injection System 14 82...
Page 146: ...MEDRAD Mark 7 Arterion Injection System 17 138...
Page 152: ...MEDRAD Mark 7 Arterion Injection System 18 144...
Page 156: ...MEDRAD Mark 7 Arterion Injection System A 148...
Page 161: ......