
Troubleshooting
5
Beam spot viewed in T2-telescope is
larger than normal
T2-telescope infinity focus needs
calibration.
Beam expander is not set correctly
for collimation.
Optics in beam path need
cleaning.
Alcohol pool dirty. Shake pool or
replace alcohol.
Test beam viewed in periscope has flat
side (not circular).
Dropper not aligned properly
with interferometer.
Superspring not leveled or not
aligned properly with
interferometer.
Cannot obtain >200mv amplitude on
analog fringe output with alignment
optimized.
Rotate
λ
/4plate lens in front of
faraday isolator to increase beam
intensity.
Analog fringe output clipped with
alignment optimized.
Intentionally mis-align the input
into the fiber optic. Set fringes at
about 340 mV
Larger than expected single drop
distributions or multi-node histogram
on computer display or simply too
large of a scatter at a quiet site
(100
µ
Gal)
This can be due to the software
incorrectly detecting a peak hop.
Rerunning the data without the
peak detect should solve the
problem in replay. The problem
could be due to the 1f signal is not
hooked up correctly or the time
constant is set to FLAT. The time
constant should be set to 1s.
Data drop-outs
Laser not locked (possibly due to
mechanical vibrations, air flow on
instrument, or optical feedback)
5-6
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......