
How to Set Up and Run the FG5
3
5. Open the Interferometer case, and place the laser on the floor about 1 m from
the reference mark. Take care not to stress the fiber optic.
6. Connect the main AC power cable from the mains power input (rear of
electronics case) to the AC power receptacle. If a GUPS (or similar
uninterruptible power supply) is used with the FG5, the GUPS should be
connected to the main AC power source and the FG5 AC power supply
should be connected to the GUPS output.
7. Turn on the main AC and DC power switches on (rear of electronics case).
8. Connect the applicable power cables to the laser and Turn on the laser power.
Consult the instructions below for the proper laser.
3.1.1.1.Model ML-1 Laser:
3.1.1.1.1.Warm Up
(Consult ML-1 operating manual for more details)
•
Set the MODE switch to the WARMUP position.
•
Turn on the main power switch and the key switch for the laser tube HV.
•
Set the heater current to 0.3 V using the front panel monitor to view
current..
•
Allow the laser to warm up for at least half an hour before locking.
3.1.1.1.2.Operation
•
After the laser is warm, turn the REMOTE switch ON (the REMOTE LED
should light). This allows the computer to control the red/blue side-lock
choice.
3-2
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......