
Adjustment and Maintenance
4
4.4.2.DATA ACQUISITION
4.4.2.1.Computer Interface Cards
The computer running the system is a Pentium II machine (or better). The
combination A/D converter and Parallel Input Output (PIO) board is used for
interfacing the computer with the environmental sensors. The other computer
card is the Time Interval Analyzer (TIA). Inputs for the TIA are listed in the table
below.
TIME INTERVAL ANALYZER (TIA) INPUT SIGNALS
Name Type
Destination
Description
Channel A
BNC
Interferometer
Base “TTL”
FRINGES
Channel B
BNC
NOT USED
Trigger Arm
(EXT ARM)
BNC
Patch Panel
“trigger out”
External Trigger
External Clock
(EXT CLK)
BNC
Power Supply
“10 MHz”
External Clock
4.5. DROPPER CONTROLLER
The dropper controller is a flexible control circuit
(programmable servo
controller) that can direct the motor to servo the cart (and test mass) to a
specified height in the dropping chamber using a rotary shaft encoder, or to a
specific velocity, again using the shaft encoder. The controller can also direct the
motor to track the test mass during free-fall using the sphere detector system.
The dropper controller board uses an EPROM to allow control over the motor
drive signal sources (the shaft encoder and the sphere detector), as well as
programmable offsets (command voltages) for each servo mode. This EPROM
4-25
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......