How to Set Up and Run the FG5
3
3. How to Set Up and Run the FG5
3.1. Setting Up the FG5
NOTE: These instructions are based on the assumption that all subsystems of
the FG5 are aligned correctly and operating properly. If adjustment or
alignment is necessary, consult chapter 4, “Adjustment and Maintenance” for
instructions, before proceeding with set up. When setting up the FG5, it is
helpful to use the FG5 Setup Checklist in Appendix D.
Locate and mark a reference point on the floor where gravity will be measured.
THE FLOOR SHOULD BE AS CLEAN, SMOOTH, AND LEVEL AS POSSIBLE.
IT IS BEST TO SET UP THE FG5 ON A CONCRETE OR HARD TILE FLOOR!
3.1.1.ELECTRONICS CASE
1. Place the electronics case in a convenient location about 1 meter from the
reference mark.
2. Check the input voltage settings and make sure they are set to the proper AC
line voltage. If the instrument is not set to the correct voltage see appendix A
for instructions on switching the input voltage settings.
3. Make sure the following switches are
off
:
•
Main AC power (rear)
•
Main DC power (rear)
•
Laser power (main AC power and key switch)
•
Superspring coil
4. If the ion pump has been maintaining the dropper vacuum on battery power,
open the dropping chamber case and apply AC power to the ion pump
power supply. See the Ion Pump Model 125 Manual for more details.
3-1
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......