
How to Set Up and Run the FG5
3
pressure on the travel lock mechanism. While holding this position, pull out
the brass knob, rotate it 90° in either direction, and gently release it so the pin
in the shaft rests in the lock. Gently release the wrench or ball driver from the
motor shaft.
3.1.5.ION PUMP
(If the ion pump is already on and maintaining the chamber vacuum, skip to step
to “Leveling the Dropping Chamber” below)
24. Recheck the AC, BAT, and HV switches on the ion pump power supply, and
make sure they are off.
25. Connect the ion pump HV cable to the ceramic connector on the pump.
Connect the small green safety ground umbilical of the HV cable to one of the
banana jacks located on the base of the dropping chamber near one of the
handles. Connect the safety HV ground to the other banana jack on the base
of the dropper. Tie both cables to a tripod leg with a velcro strap.
26. If the vacuum in the dropping chamber has remained intact since the
previous use, the ion pump alone may be sufficient to pump down the
chamber. The ion pump will probably start if it has been off for two hours or
less. Appendix B discusses the use of the turbo pump.
27. Before turning on the ion pump, set the front panel meter select knob to
PUMP VOLTAGE (kV)
. Turn on the pump and check the meter. The
voltage should be at least 2 kV within 5 minutes after turning on the ion
pump. An
increasing
voltage usually indicates that the ion pump is starting.
Nominal voltages (at operating pressure) are:
4 kV on AC
3 kV on battery power
28. If the ion pump does not start within 5 minutes, shut off the power at the ion
pump power supply, and prepare to pump the dropping chamber with the
turbo pump. See appendix B for instructions.
3-7
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......