
Checklists and Logs
Appendix D
Rotation Monitor (if applicable). Otherwise, skip to dropping
chamber.
Unplug all cables and store in rotation monitor case.
Secure lids to electronics case.
Remove rotation monitor from dropper and place in its case. Close
case and secure all latches.
Replace two M6X35 screws in top dropper flange. Replace viewing
port cover.
Dropping
Chamber
Engage cart travel lock.
Remove dropping chamber from tripod and place in dropping
chamber case. Place ion pump controller and cables in dropping
chamber case too.
Lift tripod from interferometer base. Remove legs and store in
dropping chamber tripod case.
Place brass feet in superspring case and blue pads in dropper tripod
case.
Place tripod tray in dropping chamber tripod case.
Close dropping chamber tripod d secure latches.
9-27
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......