
Troubleshooting
5
5.4. AC POWER
Problems with AC power are not uncommon, especially in remote field
environments. Make sure that ground is available before plugging in system. It
is always best to use voltage stabilizers and/or uninterruptible power supplies to
minimize problems with unreliable line voltage. Some system components
(especially the WEO Model 100 iodine laser and system computer) are more
sensitive to line voltage fluctuations than others, so it is always best to stabilize
line voltage well enough to satisfy the requirements of the most sensitive
component.
5-15
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......