
Checklists and Logs
Appendix D
Monitor voltage at ion pump controller (should be 2 KV within 5
minutes and rising).
Table 9-3 FG5 Pump Down and Bake Out
9.4. Dropping Chamber Maintenance
9.4.1.Removing Dropping Chamber Cover
Removing Dropping Chamber Cover Checklist
Remove blank flange from vacuum valve.
Unlock valve locking ring and slowly open valve. Vent with dry
nitrogen, if possible
Remove top flange.
Loosen snubber lock nuts and screws.
Remove chamber cover from service ring. Keep bottom flange
clean and protect O-ring surface.
Table 9-4 Removing Dropping Chamber Cover
9.4.2.Replacing Dropping Chamber Cover
Replacing Dropping Chamber Cover Checklist
Inspect chamber O-ring and sealing surfaces. Lubricate O-ring, if
necessary.
Lower chamber cover over dropping mechanism.
9-7
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......