
How to Set Up and Run the FG5
3
51. Attach the rest of the system cables as described below. Both ends of all
cables are labeled with the proper location for each connector.
•
MAKE SURE THE DROPPING CHAMBER IS IN STANDBY (PRESS THE
RESET BUTTON TO FORCE THE DROPPING CHAMBER
CONTROLLER INTO STANDBY). Connect the dropping chamber signal
cable (
white
Lemo connector) from the power supply to the electrical
feedthrough on the service ring.
•
Connect the rotary shaft encoder cable (
blue
Lemo connector) from the
power supply panel to the blue Lemo connector on the motor drive
assembly.
•
Connect the DC motor power cable (
orange
Lemo connector) from the
power supply panel to the orange Lemo connector on the motor drive
assembly.
•
Connect the APD power cable (
green
Lemo connector) from the power
supply panel to the interferometer base “power” connector.
3.1.8.THE SUPERSPRING
52.
Make sure the COIL switch on the superspring controller is OFF
. Connect
the superspring control cable (
yellow
Lemo connector) from the power
supply panel to the connector on the base of the superspring.
!
DO NOT ATTACH SUPERSPRING CONTROL CABLE WHEN
THE COIL SWITCH IS ON.
53. Adjust the leveling screws on the superspring tripod, if necessary, to level the
superspring with the two precision level vials on the base.
!
CAUTION:
DO NOT ADJUST THE LEVELING VIALS
THEMSELVES. They are preset to provide the correct internal vertical reference
for the superspring.
3-11
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......