
How to Set Up and Run the FG5
3
7. Close computer lid and place computer in the system controller case.
8. Close the system controller case and secure all latches.
3.4.3.ROTATION MONITOR (IF
INCLUDED)
9. Unplug all BNC and power cables from the rotation monitor, detector box,
and electronics rack and store in the rotation monitor case.
10. Remove the rotation monitor from the dropping chamber (two M6x35
screws) and place in the rotation monitor case.
11. Close the rotation monitor case and secure all latches.
12. Replace the two M6x35 screws in the dropping chamber top flange, and
replace the viewing port cover.
13. Secure the lids to the electronics case.
3-21
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......