
Adjustment and Maintenance
4
4. Adjustment
and
Maintenance
NOTE: The FG5 has been engineered to use metric screws and dimensions
wherever possible. However, some “off-the-shelf” purchased components use
English screws and dimensions.
4.1. The
Dropping Chamber
4.1.1.REPLACEMENTS AND
ADJUSTMENTS
4.1.1.1.Removing The Dropping Chamber Cover
When opening the dropping chamber, take great care not to contaminate the
inside surface of the chamber cover or any of the interior parts. Always wear
clean-room gloves when handling internal parts. If any of the parts are
contaminated, clean the part using accepted vacuum system cleaning procedures
before reassembly. When performing repairs in the field, it is sufficient to wipe
or flush the contaminated parts with alcohol. Whenever possible, vent the
chamber with dry nitrogen rather than air. This will reduce the pump down
time after the chamber is reassembled.
To vent the dropping chamber, remove the clamp and blank flange from the
vacuum valve on the service ring. Loosen the vacuum valve lock ring and
slowly open the valve by rotating the control knob, allowing the chamber to
return to atmospheric pressure. It is best to vent using dry nitrogen, but it can be
directly vented to air. In any case, try to ensure that the gas entering the
chamber is free of particulate matter.
Remove the six screws holding the top flange to the top of the dropping chamber
cover, and remove the flange. Loosen the four snubber lock nuts and back out
the screws which position the top ring of the dropping mechanism within the
4-1
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......