Adjustment and Maintenance
4
Note 1: This will take time as the Test mass must settle down after each
adjustment.
Note 2: Be careful not to let dust or debris fall onto corner cube. Re-check the
level of the test mass and set level bubbles by turning brass screws. Lock position
with center lock screw. Replace the Superspring cover as previously described.
4.3.1.7.Replacing the Focus Lever Motor
Loosen and remove the nut on the focus adjustment screw. Lower the focus
lever motor assembly off the fulcrum lever.
Loosen the set screw holding the hex bushing to the motor shaft and raise the
bushing out of the way. The screws holding the motor to the motor mount are
now accessible, and can be removed. Reverse the procedure to install the new
motor.
4.3.1.8.Adjusting the Micro-Switches
Adjust the trip positions of the micro-switches that control the limits of travel of
the focus adjustment motor by changing the position of the set screws in the
actuator arms. The limit switches should shut off the zero-positioning motor
(ZPM) when the gap between the focus lever and the fulcrum plate is 4-8mm.
4.3.1.9.The Aneroid Wafer Assembly
To compensate for the thermal expansion and contraction of the Superspring, an
aneroid wafer assembly adjusts the position of the top hanger. The position of
the aneroid assembly is set by the manufacturer, and should not need to be
adjusted.
4-19
Summary of Contents for Micro-g LaCoste FG5
Page 7: ...Table of Figures This Page is Intentionally Blank vii ...
Page 8: ......
Page 13: ...Design Components and Function 2 Figure 2 3 Side view of the dropping chamber 2 3 ...
Page 23: ...Design Components and Function 2 Figure 2 9 The Superspring 2 13 ...
Page 31: ...Design Components and Function 2 Figure 2 12 Rotation Monitor 2 21 ...
Page 32: ...Design Components and Function 2 This Page is Intentionally Blank 2 22 ...
Page 36: ...How to Set Up and Run the FG5 3 Figure 3 1 Superspring Interferometer Setup 3 4 ...
Page 56: ......
Page 59: ...Adjustment and Maintenance 4 4 3 ...
Page 78: ...Adjustment and Maintenance 4 4 22 ...
Page 106: ......
Page 138: ...Checklists and Logs Appendix D Measure gap between two levers near ZPM 9 24 ...
Page 143: ...Checklists and Logs Appendix D This Page is Intentionally Blank 9 29 ...
Page 144: ......