Chapter 3: Installation and Setup
3.1 General
This chapter describes the process of preparing a site, unpacking the probe station
components and assembling them into the standard Model CRX-6.5K configuration.
Finally, it explains system checkout procedures.
3.1.1 Lake Shore
Assisted Installation
Lake Shore personnel or trained representatives are available to assist with the
installation process. When installation and training services are purchased with the
probe station, the customer will be contacted and provided with the Model CRX-6.5K
site prep form and applications engineer contact information shortly after the order
is placed. To avoid delays in the installation process, please read the form carefully as
soon as it arrives.
Customers are responsible for completing section 3.2 through section 3.5 before an
installation trip can be scheduled.
3.2 Site
Requirements
This section describes the space, utilities and equipment that must be provided at the
installation site to properly install, test and operate a Model CRX-6.5K probe station.
Much of the equipment described in section 3.2.3 to section 3.2.6 is not included with a
standard Model CRX-6.5K probe station or as part of the installation and training service.
Some of that equipment can be purchased from Lake Shore as options or accessories;
those model numbers are listed in the relevant sections.