50
CHAPTER 3:
Installation and Setup
Model CRX-6.5K Probe Station
3.3.4 Moving
and Lifting the
Probe Station
If space and equipment is available, the loaded shipping crates should be moved to
the installation site intact. They can be moved easily with a pallet jack while the
contents remain protected.
Use lifting equipment throughout this procedure. The probe station is very heavy, has a
high center of gravity, and is uneven in its weight distribution. Failure to comply may
result in injury or death.
If the Model CRX-6.5K must be moved after the initial installation, use section 3.6.1
and as a guide to reinstall the red spacing washers to lock the inner CCR stand to the
outer stand.
Before lifting or moving the probe station, the outer stand and inner CCR stand must be
locked together with the locking bolts and red spacing washers shown in . Failure to
secure these together before lifting will result in permanent damage to the probe station.
3.3.5 Uncrating the
Probe Station
These steps will assist you in safely removing the probe station from its crate.
1. Using a Phillips head screw driver, remove the screws from the top of the crate
containing the probe station.
2. Remove the screws around the perimeter of both short panel walls of the crate
and remove both short walls. Make sure a second person holds onto each of the
panels as you remove the screws to make sure the panels do not fall on you or the
probe station.
3. Repeat step 2 to remove both long panel walls.
4. Remove any plastic wrap covering the probe station. To avoid damaging the
probe station, find the end of the plastic wrap and unwind it by hand
FIGURE 3-3
Use lifting equipment if the probe
station must be moved after it is uncrated