3.4 Utility
Connections
Use the following procedures to complete the utility connections required for the
Model CRX-6.5K probe station. The items in this section must be completed prior to
the arrival of a Lake Shore representative for installation and training. You may also
need to refer to the CCR compressor and cold head manual for further information.
3.4.1 Power
Connections
A 3-Prong NEMA L6-20P plug comes with the compressor. This plug may need to be
changed for connection to your facility power. This should be completed by a
qualified electrician adhering to all local codes and standards, prior to the arrival of a
Lake Shore representative for installation and training. Consult the Installation
section of the HC-4E1 Helium Compressor Technical Manual for instructions on
connecting the power to the compressor. Refer to the section above for power
requirements information.
3.4.2 Cooling Water
Connections
The water requirements for the CCR compressor are described in section 3.2.4.
1. Locate the 1/2 in Swagelok compression internal connection on the compressor
marked Inlet, and connect it to the supply of your facility’s water system
(FIGURE 3-9).
2. Locate the 1/2 in Swagelok compression internal connection on the compressor
marked Outlet, and connect it to the return of your facility’s water system
(FIGURE 3-9).
Consult the Installation section of the HC-4E1 Helium Compressor Technical Manual
for instructions on connecting the cooling water to the compressor. The water
requirements for the CCR compressor are described in the site requirements section.
FIGURE 3-9
Water inlet and outlet on the compressor