3
INSTALLATION
22
OPTIWAVE 1010
www.krohne.com
10/2016 - 4003537403 - MA OPTIWAVE 1010 R03 en
3.6 Recommended mounting position
CAUTION!
Follow these recommendations to make sure that the device measures correctly. They have an
effect on the performance of the device.
CAUTION!
Make sure that the cable glands are aligned with the process connections of the bypass
chamber.
Figure 3-6: Recommended mounting position
1
Internal tube diameter. Min. ... Max.: 38...56 mm / 1.50...2.20
¨
2
Float offset (the distance between the surface of the liquid and the radar target on top of the float). Min. ... Max.:
0...200 mm / 0...7.87
¨
.
3
Distance to top process connection (bypass chamber) = minimum distance (refer to the "basic parameters" menu in
the DTM)
4
Distance to bottom process connection (bypass chamber) = maximum distance (refer to the "basic parameters" menu
in the DTM)