2
Getting to Know Your System
2-36
Di5510/Di7210
Switching On the System (daily)
1
Ensure that the main switch is set to
position I (ON).
2
Press the power switch to switch on
the system.
The warm-up phase (about 5 and a
half minutes for the Di5510,
about 6 minutes for the Di7210)
begins. A copy job can be set up
now. Touch the touch screen briefly.
The basic options are then
displayed. The status display shows
the following message:
Position original in the EDH face up
.
The copy job can be set up.
Changing the default system settings!
The default system setting that is active after switching on or resetting
the system can be changed. For more information, see page 7-1.
Summary of Contents for Di5510
Page 1: ...Di5510 Di7210 Advanced Information...
Page 2: ......
Page 28: ...1 Introduction 1 16 Di5510 Di7210...
Page 90: ...2 Getting to Know Your System 2 62 Di5510 Di7210 9 Close the finisher door...
Page 96: ...2 Getting to Know Your System 2 68 Di5510 Di7210...
Page 148: ...3 Initial Steps 3 52 Di5510 Di7210...
Page 236: ...4 Basic Functions 4 88 Di5510 Di7210...
Page 352: ...6 Network functions 6 54 Di5510 Di7210 3 Configure settings as required...
Page 455: ...Troubleshooting 8 Di5510 Di7210 8 13 5 Close the finisher door...
Page 457: ...Troubleshooting 8 Di5510 Di7210 8 15 5 Close the finisher door...