6. Engine Removal;Inspection & Installation
6-7
Special maintenance tools
z
If have related requirements,
should use the special maintenance
tools or equivalent tools.
Disassemble
z
If remove the process is more
complex, there are many zero
department a need to remove, should
be in all parts do not affect its
function or appearance place do
mark, remember to area don't, easy
to assemble.
In the process of split down, and the
check
z
Remove the parts should be carefully
check whether there is so disabled,
deformation, damage and other problems.
Components placed
z
All the parts should be
removed had placed so
that to group outfit.
z
Need to replace parts and need to
use again parts should be placed or
make marks respectively.
6
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...