6. Engine Removal;Inspection & Installation
6-39
5.6 The piston pin examination
1 As shown in the piston pin and the piston and
connecting rod joints three parts along the X and Y
directions measuring the outer diameter of piston pin.
●
If more than specification limits, please the piston,
piston, piston pin as a whole to change.
2. The piston pin outside diameter standards
22.998-22.994 mm
Timing chain examination
5.7 The chain guide a and the chain of tension
bar examination
1.
The chain tension rod and guide a and chain
engage face worn grooves, the replacement
of the stem guide a tension.
6
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...