6. Engine Removal;Inspection & Installation
6-58
As shown in figure reverse gear shaft
assembly, reverse gear shaft to vice axis
tilt to success in the right.
13.
Box assembly
1
.
According to the list, as shown in the
assembly sequence
1 Hexagon flange boltsM8*90 torsion25N 6
Shift positioning spring
2 Hexagon flange boltsM6*105torsion10N 7
Hexagon flange boltsM14*26 torsion30N.m
3 Hexagon flange boltsM6*85 torsion10N 8
Al washer
Φ
6*
Φ
12*1.5
4 Hexagon flange boltsM6*95 torsion10N 9
oil seal
Φ
12*
Φ
25*7(see Z-10 installa
instructions
)
5 Shift positioning steel ballsSR4.5
10 water seal
(
See Z-11 installation instructions
Close box use sealant
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...