6. Engine Removal;Inspection & Installation
6-15
1.4
No pneumatic board in the hand
with dedicated tools will be
active wheel fixed remove.
1.5
As shown in figure CVT active wheel
dial the come out, even with driven
pulley and belt off together.
1.6
As shown in figure remove three
M6 * 18 hex flange bolts and five
M6 * 12 countersunk head screws,
then remove the left box nakedness.
1.7
CVT belt examination
:
1.7.1.
The belt can't have crack, such as a
crack will need to change.
1.7.2
.
The width of the CVT belt
examination
.
6
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...