8. FRONT WHEEL, FRONT BRAKE
,
SUSPENSION
,
STEERING
8-9
FRONT WHEEL ASSY DISASSEMBLY /INSTALLATION
1.CAP , WHEEL CENTER
2. PIN , SPLIT
(
3×35
)
3. SCREW CAP
,
DRIVE AXLETREE(M20×1.5)
4. NUT , WHEEL(M10×1.25)
5. VALVE , RIM
6. RIM , FR. WHEEL(12×6)
7. FRONT TIRE
(
25×8-12
)
8. HUB, FR. WHEEL
9. BOLT, WHEEL
(
M10×35×1.25
)
10. HUB, FR. WHEEL
11. FRONT BRAKE DISC
12. BOLT, BRAKE DISC
(
M8×16
)
13. MUDGUARD,L.FR. BRAKE DISC
14. MUDGUARD,R.FR. BRAKE DISC
15. BOLT,FLANGE
(
M8×12)
16. DUST SEAL(
φ
22.5×
φ
26.5×10)
8
Summary of Contents for 500ATV
Page 1: ...Service Manual 500ATV 500ATV 2 4 4 ...
Page 16: ...1 SERVICE INFORMATION 1 14 ...
Page 17: ...1 SERVICE INFORMATION 1 15 1 ...
Page 18: ...1 SERVICE INFORMATION 1 16 ...
Page 32: ...2 Vehicle body Muffler 2 14 Visible Parts ...
Page 53: ...4 COOLING SYSTEM 4 7 Cooling System Chart 4 ...
Page 63: ...6 Engine Removal Inspection Installation 6 1 Wu Yang 500 CC engine maintenance manual 6 ...
Page 71: ......
Page 72: ......
Page 73: ...6 Engine Removal Inspection Installation 6 11 Engine information 6 ...
Page 190: ...11 BATTERY CHARGING SYSTEM 11 9 Layout for All Electricity Equipment in Vehicle ...
Page 192: ...12 IGNITION SYSTEM 12 2 Ignition System Diagram ...
Page 200: ...12 IGNITION SYSTEM 12 10 Layout for Ignition System Equipment in Vehicle ...
Page 212: ...13 Lighting Instruments Switches 13 12 500ATV Circuit Diagram ...